Material: | Copper / Aluminum | Certificate: | ISO900/ CE/ROHS |
---|---|---|---|
Application: | Lithium-ion Battery | Usage: | Tab |
Advantage: | Welding | MOQ: | 10000pcs |
Highlight: | nickel battery tabs,nickel solder tabs |
0.1mm thickness Aluminium tabs/Nickel tabs for lithium battery production
Battery tabs play an important role in lithium-ion cell manufacturing. A typical large format lithium-ion cell uses copper foil as the anode current collector and aluminum as the cathode current collector. A ‘foil-to-tab’ weld is needed to gather all the current collector plates (foils) inside the cell and join them to a tab which exits the cell casing, allowing the cell’s energy to be transferred to an external source. There are two foil-to-tab welds in each cell, and hundreds of cells in a typical lithium-ion battery pack.
The aluminum-clad copper material tab provides a low cost and high-performance solution for li-ion battery tab joining. Nowadays, the leads or tabs from Li-ion pouch and prismatic cells are often configured with one lead of copper and the other lead of aluminum. This brings a challenge for welding copper to aluminum with the busbar. By replacing one of the leads with an aluminum-clad copper tab, the busbar joining can be applied to all aluminum to aluminum connections. This greatly simplifies the welding process.
Type | Li-Ion, Battery Solder Tabs, Nickel Tabs for Battery , Nickel Sheet |
Payment term | T/T, Alipay, Western Union |
Application | Battery Pack Connector |
Packaging Details:10000pcs/bag, 3 bags/ carton
Lead Time :
Quantity(Pieces) 1 - 10000 >10000
Est. Time(days) 11 To be negotiated
Q: Are you trading or manufacturer ?
A: We are company,and we have our own factory
Q: How long is your delivery time?
A: Generally it is 2-3 days if the goods are in stock. or it is 5-7 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us